Variation orders and claims register

Keep every instruction, variation order (change order), claim and extension of time in one register, priced, dated and linked to its evidence.

From instruction to approved variation

  • Instructions from the Engineer or the owner, answered by the contractor as no cost, variation or disputed.
  • Variations priced by item, submitted by the contractor, reviewed by the consultant and approved by the owner, every step dated and named.
  • The revised contract sum is always the original sum plus approved variations.
  • Watch on variations as a share of the contract sum.
Variation with its approval trail, amount and time
Variation with its approval trail, amount and time
Claim for extension of time with linked evidence
Claim for extension of time with linked evidence

Claims and extension of time (EOT)

  • Claims with extension of time, linked site events, photos and letters as evidence.
  • Continuing claims with interim updates.
  • Notice periods and time bars of your form of contract counted on each claim, with reminders before the deadline. Try the time-bar calculator →
  • Business+ Time impact analysis with fragnets on the programme, and prolongation cost by head.

Free variation and claims register (Excel)

One sheet for variation orders (instruction, value submitted and approved, time, status) and one for claims (event date, notice and detailed-claim deadlines worked out from the date, status). Totals and the revised contract sum calculate themselves.

Free, no sign-up. Figures in the file are examples; replace them with your own.

Download the Excel file

Questions

What is the difference between a variation and a claim?
A variation is a change instructed under the contract and valued under it. A claim is the contractor's (or the employer's) request for time or money for an event, made by notice within the contract's period. Quanto keeps both, linked where a claim follows an instruction.
Which forms of contract are covered?
FIDIC 2017 and 1999, NEC4 ECC, JCT 2024 and VOB/B 2016, each with its own periods. Other contracts start from editable values.
Do the consultant and owner need a paid account?
No. Parties you invite join free.